Maryland Asphalt Sealing Service

Restore the look of your asphalt driveway. 

Fairway Asphalt offers complete driveway maintenance services. Proper maintenance of your asphalt will double or even triple the life of your property. It's much cheaper to maintain than it is to replace!

Your Driveway will be sealed with top-quality commercial grade emulsion sealers containing a high-sand content for extended-wear and slip resistance!

We are a local company with over 20 years of experience in the asphalt business. We use first rate materials and machinery to insure a beautiful long lasting job. Our main priority is customer satisfaction, knowing you are 100% happy when we leave your home or business.
  • Asphalt repair
  • Weed removal
  • Oil spots cleaned and primed
  • Cleaning driveway
  • Crack filling
  • Environmentally friendly

We Only Use Quality Neyra Force Asphalt Emulsion

Neyra Force is a water-based, petroleum resin sealer that outperforms traditional pavement sealers. While providing the benefits of a coal tar sealer, Neyra Force is environmentally friendly and safer for your family and pets than other formulations.

A PREMIUM ALTERNATIVE

Neyra Force is a high performance alternative to both coal tar and asphalt emulsion sealers providing exceptional coverage, durability and color stability

DURABLE & LONG LASTING

Proprietary engineered resin is formulated to create tough and long lasting protection

PROTECTS & BEAUTIFIES

A tight seal forms an impenetrable barrier to protect against the destructive effects of sun, oxidation, water and chemicals, giving pavement a jet black color

GAS & OIL RESISTANT

Resists damage caused by gasoline, oil jet fuel leaks and spills

ENVIRONMENTALLY FRIENDLY

A low VOC, non-flammable coating that contains NO coal tar

COOL WEATHER FORMULA AVAILABLE

Engineered to perform at temperatures as low as 40°F
Learn More About Asphalt Sealing

Frequently Asked Questions

Get quick answers to our most frequently asked questions about sealing your driveway or parking lot

Image 2 (3)
Still have questions?

Can’t find the answer you’re looking for? Contact us!

Asphalt pavements are made up of stone, aggregate, tar, petroleum binders, and fine stone.  New asphalt is jet black, but soon begins to fade due to oxidation.  This is the effect of sun, rain and snow oxidizing the asphalt pavement.  Given enough time, the pavement becomes brittle and less resistant to loads placed on it.

Asphalt is a petroleum product, so any other petroleum derivatives that contact it will dissolve into the asphalt.  These products commonly include:

  • Motor oil
  • Transmission, power steering and brake fluids
  • Gasoline
  • Household solvents

A good quality sealcoating will protect the asphalt from these damaging factors, while providing curb appeal.  Many years of research has proven that proper maintenance, including sealcoating, can double the life of an asphalt driveway.

We use a commercial grade emulsion sealer with a high sand content.

Fairway Asphalt Svc offers both applications. In some cases, we may feel one method is better for your driveway.

Please let us know if you have any preference.

Cracks in pavement may require one of several sealant materials.

Left alone cracks allow moisture to penetrate the asphalt surface. Water expands as it freezes, so moisture in the cracks does the greatest damage in the winter.

Cracks are filled with a rubberized material. This slows deterioration and strengthens the surface despite being visible after the driveway has been sealed.

Crack sealing is not guaranteed. Killing vegetation in cracks prior to our service will improve crack sealing and  keep cracks sealed longer.

These spider cracks will not be eliminated. They do not affect the overall structure and condition of the driveway.

Tire marks are common 1-2 weeks after seal coating. They will disappear as the sealer continues to cure.

No, sealer will not harm your lawn. A mowing or two will eliminate the sealer.

You can walk and park your car on the driveway in as little as 24 hours.  For best results, we recommend that you wait 48 hours after service is completed.

We can usually schedule you within a week.  It depends on the weather and our current workload.  Most jobs are scheduled 5-7 days out.

We will notify you the day before service by phone.